IS WORK OVER?

Automation index

How much of a Energy engineer’s job can AI already do?

A load curve comes earlier. Cutting the bill without leaving the process in the dark do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Energy engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Energy audit, curves and the saving potential.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Contracts, tariffs and the power market.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Plant, meters and what the meter misses.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Efficiency projects and the real payback.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The board, the CAPEX and the no to the project.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Save for real, and not selling green smoke.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • energy audit
  • load curves
  • power tariffs
  • energy efficiency
  • CAPEX payback
  • plant metering
  • power market
  • real savings

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Embedded developer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Firmware, the peripheral and the buffer.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the hang and the log that is not there.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Watchdog, the reset and not leaving it blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Draw, the battery and not sleeping it wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Hardware, the revision and not fighting the pin.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not hang, and not leaving the watchdog blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • firmware
  • peripherals
  • watchdog
  • buffers
  • draw
  • battery
  • field logs
  • write embedded code

Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2514

Analyse my job

Jobs with similar scores

  1. 177Automation engineer27%
  2. 178HVAC engineer27%
  3. 179Cost engineer27%
  4. 181Packaging engineer27%
  5. 182Reliability engineer27%
  6. 183Lighting engineer27%