Automation index
How much of a Energy engineer’s job can AI already do?
A load curve comes earlier. Cutting the bill without leaving the process in the dark do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Energy engineer
27%
AI can already do 27% of this job.
#160 / 633
View rankingEnergy engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Energy audit, curves and the saving potential.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Contracts, tariffs and the power market.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Plant, meters and what the meter misses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Efficiency projects and the real payback.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The board, the CAPEX and the no to the project.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Save for real, and not selling green smoke.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- energy audit
- load curves
- power tariffs
- energy efficiency
- CAPEX payback
- plant metering
- power market
- real savings
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149
IS WORK OVER?
Fisher
15%
#626 / 633
View rankingFisher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Catch logs, quotas and fishing GPS.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 32% | +4.5 |
Logged boat maintenance.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Go out, set, haul and stow.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Read the sea, the gear and the school.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Safety, storm and fatigue.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Market, price and crew life.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 15% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Catch logs, quotas and fishing GPS
- Logged boat maintenance
- Go out, set, haul and stow
- Read the sea, the gear and the school
- Safety, storm and fatigue
- Market, price and crew life
- pescador
- fisher
- pesquero
Sources for this job· O*NET 45-3011.00· ESCO/ISCO 6222