IS WORK OVER?

Automation index

How much of a Energy engineer’s job can AI already do?

A load curve comes earlier. Cutting the bill without leaving the process in the dark do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Energy engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Energy audit, curves and the saving potential.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Contracts, tariffs and the power market.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Plant, meters and what the meter misses.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Efficiency projects and the real payback.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The board, the CAPEX and the no to the project.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Save for real, and not selling green smoke.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • energy audit
  • load curves
  • power tariffs
  • energy efficiency
  • CAPEX payback
  • plant metering
  • power market
  • real savings

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Interpreter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Prep glossaries, briefings and corpora.
Estimate

No public source provides a precise figure. This is our estimate.

20%48%+9.6
Translate support documents for the event.
Estimate

No public source provides a precise figure. This is our estimate.

16%35%+5.6
Interpret simultaneous or consecutive in the room.
Estimate

No public source provides a precise figure. This is our estimate.

24%12%+2.9
Manage fatigue, booth and handover.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Ethics, confidentiality and live correction.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Clients, credentials and specialism.
Estimate

No public source provides a precise figure. This is our estimate.

12%18%+2.2
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • translate texts
  • interpret
  • proofread translations
  • Prep glossaries, briefings and corpora
  • Manage fatigue, booth and handover
  • Clients, credentials and specialism
  • interprete
  • interpretacion simultanea

Sources for this job· O*NET 27-3091.00· ESCO/ISCO 2643

Analyse my job

Jobs with similar scores

  1. 157Printing press operator27%
  2. 158Food engineer27%
  3. 159Automation engineer27%
  4. 161Packaging engineer27%
  5. 162Materials engineer27%
  6. 163Renewables engineer27%