Automation index
How much of a Energy engineer’s job can AI already do?
A load curve comes earlier. Cutting the bill without leaving the process in the dark do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Energy engineer
27%
AI can already do 27% of this job.
#160 / 633
View rankingEnergy engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Energy audit, curves and the saving potential.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Contracts, tariffs and the power market.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Plant, meters and what the meter misses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Efficiency projects and the real payback.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The board, the CAPEX and the no to the project.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Save for real, and not selling green smoke.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- energy audit
- load curves
- power tariffs
- energy efficiency
- CAPEX payback
- plant metering
- power market
- real savings
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149
IS WORK OVER?
Mason
15%
#617 / 633
View rankingMason
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read drawings, measure and order material.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 30% | +4.8 |
Setting out and levels on site.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Raise walls, render and plaster.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Floors, tiling and finishing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Safety, scaffolding and clearing the bay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Coordinate with foreman, plumber and electrician.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
| Total | 100% | 15% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- build walls
- plaster
- site work
- Read drawings, measure and order material
- Setting out and levels on site
- Raise walls, render and plaster
- Floors, tiling and finishing
- Safety, scaffolding and clearing the bay
- albanil
- mason
Sources for this job· O*NET 47-2021.00· ESCO/ISCO 7112