IS WORK OVER?

Automation index

How much of a Energy engineer’s job can AI already do?

A load curve comes earlier. Cutting the bill without leaving the process in the dark do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Energy engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Energy audit, curves and the saving potential.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Contracts, tariffs and the power market.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Plant, meters and what the meter misses.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Efficiency projects and the real payback.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The board, the CAPEX and the no to the project.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Save for real, and not selling green smoke.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • energy audit
  • load curves
  • power tariffs
  • energy efficiency
  • CAPEX payback
  • plant metering
  • power market
  • real savings

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Neuropsychologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Battery, norms and the report.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Patient, the fatigue and the one who quits the test.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Imaging, the lobe and not forcing the figure.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Rehab, the aim and what still can.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The family, the report and not scaring.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Say what is left, and not selling an extra diagnosis.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • neuropsych batteries
  • test norms
  • cognitive rehab
  • neuropsych reports
  • test fatigue
  • lobes
  • the family
  • not scare

Sources for this job· O*NET 19-3039.00· ESCO/ISCO 2634

Analyse my job

Jobs with similar scores

  1. 159Printing press operator27%
  2. 160Food engineer27%
  3. 161Automation engineer27%
  4. 163Packaging engineer27%
  5. 164Materials engineer27%
  6. 165Renewables engineer27%