IS WORK OVER?

Automation index

How much of a Energy engineer’s job can AI already do?

A load curve comes earlier. Cutting the bill without leaving the process in the dark do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Energy engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Energy audit, curves and the saving potential.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Contracts, tariffs and the power market.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Plant, meters and what the meter misses.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Efficiency projects and the real payback.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The board, the CAPEX and the no to the project.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Save for real, and not selling green smoke.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • energy audit
  • load curves
  • power tariffs
  • energy efficiency
  • CAPEX payback
  • plant metering
  • power market
  • real savings

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

School psychologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Referral, tests and the report.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
The child, the session and the one who will not talk.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Classroom, the teacher and what actually happens.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Family, the fear and not scaring.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The bullying protocol and not looking away.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
See the child, and not hanging a label.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • school reports
  • sessions with children
  • psychological tests
  • bullying protocol
  • the family
  • real classroom
  • not label
  • the tutor's referral

Sources for this job· O*NET 19-3031.00· ESCO/ISCO 2634

Analyse my job

Jobs with similar scores

  1. 163Printing press operator27%
  2. 164Food engineer27%
  3. 165Automation engineer27%
  4. 167Packaging engineer27%
  5. 168Materials engineer27%
  6. 169Renewables engineer27%