Automation index
How much of a Environmental engineer’s job can AI already do?
A discharge model comes earlier. A plant that complies and does not poison the river does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Environmental engineer
25%
AI can already do 25% of this job.
#268 / 753
View rankingEnvironmental engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model emissions, discharges and noise.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Impact studies, permits and specs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Field, sampling and treatment plants.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Authorities, public and objections.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Rules, reports and monitoring.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not dressing an environmental figure.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Model emissions, discharges and noise
- Impact studies, permits and specs
- Field, sampling and treatment plants
- Authorities, public and objections
- Rules, reports and monitoring
- Not dressing an environmental figure
- ingeniero ambiental
- environmental engineer
Sources for this job· O*NET 17-2081.00· ESCO/ISCO 2143
IS WORK OVER?
Aerospace technician
19%
#647 / 753
View rankingAerospace technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Bench, the protocol and the torque.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Part, the lockwire and the one left loose.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
NDT, the crack and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Engine, the run and the one that does not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The engineer, the rush and not signing half done.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Torque it, and not leaving the lockwire loose.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- test bench
- torque
- lockwire
- aerospace NDT
- engine runs
- protocols
- cracks
- not sign half done
Sources for this job· O*NET 17-3021.00· ESCO/ISCO 3115