IS WORK OVER?

Automation index

How much of a Environmental engineer’s job can AI already do?

A discharge model comes earlier. A plant that complies and does not poison the river does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Environmental engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model emissions, discharges and noise.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Impact studies, permits and specs.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Field, sampling and treatment plants.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Authorities, public and objections.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Rules, reports and monitoring.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not dressing an environmental figure.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model emissions, discharges and noise
  • Impact studies, permits and specs
  • Field, sampling and treatment plants
  • Authorities, public and objections
  • Rules, reports and monitoring
  • Not dressing an environmental figure
  • ingeniero ambiental
  • environmental engineer

Sources for this job· O*NET 17-2081.00· ESCO/ISCO 2143

Process engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
P&IDs, balances and the operating procedure.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Plant, trials and the real bottleneck.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Capacity, yields and the improvement report.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Start-up, shutdown and the shift that skips the SOP.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Process safety and the HAZOP that hurts.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Not overloading the reactor, and signing the change.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • P&IDs
  • mass balances
  • HAZOP
  • plant start-up
  • improve yields
  • SOP
  • bottlenecks
  • process safety

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 226Administrative agent25%
  2. 227Historian25%
  3. 228Aerospace engineer25%
  4. 230Biomedical engineer25%
  5. 231Civil engineer25%
  6. 232Petroleum engineer25%