Automation index
How much of a Environmental health officer’s job can AI already do?
A report comes earlier. Shutting the kitchen that poisons people without looking away do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Environmental health officer
22%
AI can already do 22% of this job.
#474 / 743
View rankingEnvironmental health officer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Inspection, the report and the sample.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Kitchen, the cold and the one that never gets there.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Water, the analysis and the village.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Shut it, the mayor and not yielding.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The outbreak, the source and not delaying.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Shut the kitchen, and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- inspection reports
- food safety
- water samples
- shut kitchens
- temperatures
- food outbreaks
- mayors
- not yield
Sources for this job· O*NET 19-5011.00· ESCO/ISCO 2263
IS WORK OVER?
Site engineer
19%
#598 / 743
View rankingSite engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Setting-out, axes and the level.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Rebar, cover and the one that is missing.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Concrete, the slump and not pouring if it fails.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Note, the diary and not dressing the delay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The site manager, the rush and not covering bad steel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That the column is there, and not covering the steel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- setting-out
- axes
- rebar
- cover
- slump
- site diary
- levels
- not cover steel
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142