IS WORK OVER?

Automation index

How much of a Environmental health officer’s job can AI already do?

A report comes earlier. Shutting the kitchen that poisons people without looking away do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Environmental health officer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Inspection, the report and the sample.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Kitchen, the cold and the one that never gets there.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Water, the analysis and the village.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Shut it, the mayor and not yielding.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The outbreak, the source and not delaying.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Shut the kitchen, and not looking away.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • inspection reports
  • food safety
  • water samples
  • shut kitchens
  • temperatures
  • food outbreaks
  • mayors
  • not yield

Sources for this job· O*NET 19-5011.00· ESCO/ISCO 2263

Site engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Setting-out, axes and the level.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Rebar, cover and the one that is missing.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Concrete, the slump and not pouring if it fails.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Note, the diary and not dressing the delay.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The site manager, the rush and not covering bad steel.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That the column is there, and not covering the steel.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • setting-out
  • axes
  • rebar
  • cover
  • slump
  • site diary
  • levels
  • not cover steel

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 471Metrology technician22%
  2. 472Waste technician22%
  3. 473Irrigation technician22%
  4. 475Public health officer22%
  5. 476Semiconductor technician22%
  6. 477Telephony technician22%