Automation index
How much of a Environmental technician’s job can AI already do?
A sampling round comes earlier. Measuring for real without hiding the spike do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Environmental technician
22%
AI can already do 22% of this job.
#477 / 753
View rankingEnvironmental technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Sampling, chain and the blank.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the discharge and the one you cannot see.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Report, limits and not dressing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Inspection, the firm and holding.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The council, the complaint and not sitting on the figure.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Measure for real, and not hiding the spike.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- environmental sampling
- discharges
- limits
- blanks
- environment reports
- inspection
- complaints
- sample chain
Sources for this job· O*NET 19-4042.00· ESCO/ISCO 3141
IS WORK OVER?
Aerospace technician
19%
#647 / 753
View rankingAerospace technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Bench, the protocol and the torque.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Part, the lockwire and the one left loose.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
NDT, the crack and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Engine, the run and the one that does not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The engineer, the rush and not signing half done.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Torque it, and not leaving the lockwire loose.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- test bench
- torque
- lockwire
- aerospace NDT
- engine runs
- protocols
- cracks
- not sign half done
Sources for this job· O*NET 17-3021.00· ESCO/ISCO 3115