Automation index
How much of a Environmental technician’s job can AI already do?
A sampling round comes earlier. Measuring for real without hiding the spike do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Environmental technician
22%
AI can already do 22% of this job.
#390 / 633
View rankingEnvironmental technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Sampling, chain and the blank.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the discharge and the one you cannot see.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Report, limits and not dressing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Inspection, the firm and holding.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The council, the complaint and not sitting on the figure.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Measure for real, and not hiding the spike.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- environmental sampling
- discharges
- limits
- blanks
- environment reports
- inspection
- complaints
- sample chain
Sources for this job· O*NET 19-4042.00· ESCO/ISCO 3141
IS WORK OVER?
Civil engineer
25%
#231 / 633
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142