Automation index
How much of a Environmental technician’s job can AI already do?
A sampling round comes earlier. Measuring for real without hiding the spike do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Environmental technician
22%
AI can already do 22% of this job.
#399 / 643
View rankingEnvironmental technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Sampling, chain and the blank.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the discharge and the one you cannot see.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Report, limits and not dressing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Inspection, the firm and holding.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The council, the complaint and not sitting on the figure.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Measure for real, and not hiding the spike.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- environmental sampling
- discharges
- limits
- blanks
- environment reports
- inspection
- complaints
- sample chain
Sources for this job· O*NET 19-4042.00· ESCO/ISCO 3141
IS WORK OVER?
Production engineer
25%
#238 / 643
View rankingProduction engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
OEE, sequence and the shift plan.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Line, changeovers and the micro-stop.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Layout, times and the work standard.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Supervisors, unions and the shift that turns.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
In-line quality and the batch that cannot ship.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Hit the plan, and not dressing the OEE.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- OEE
- sequence production
- changeovers
- layout
- work standards
- micro-stops
- shift plan
- in-line quality
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141