Automation index
How much of a Epidemiologist’s job can AI already do?
A model and a mapped outbreak come earlier. Calling the measure and getting people to follow it do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Epidemiologist
31%
AI can already do 31% of this job.
#34 / 623
View rankingEpidemiologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Surveillance, rates and the outbreak on the map.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Studies, bias and the report for public health.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 48% | +7.7 |
Surveys, contacts and the case interview.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Committee, the unpopular measure and the press.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Field, the care-home outbreak and dirty data.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Judgement, uncertainty and signing the alert.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 31% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- watch outbreaks
- compute rates
- epi studies
- case interviews
- map epidemics
- public-health measures
- contact tracing
- health alerts
Sources for this job· O*NET 19-1041.00· ESCO/ISCO 2263
IS WORK OVER?
Civil engineer
25%
#231 / 623
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142