Automation index
How much of a Epidemiologist’s job can AI already do?
A model and a mapped outbreak come earlier. Calling the measure and getting people to follow it do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Epidemiologist
31%
AI can already do 31% of this job.
#34 / 733
View rankingEpidemiologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Surveillance, rates and the outbreak on the map.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Studies, bias and the report for public health.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 48% | +7.7 |
Surveys, contacts and the case interview.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Committee, the unpopular measure and the press.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Field, the care-home outbreak and dirty data.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Judgement, uncertainty and signing the alert.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 31% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- watch outbreaks
- compute rates
- epi studies
- case interviews
- map epidemics
- public-health measures
- contact tracing
- health alerts
Sources for this job· O*NET 19-1041.00· ESCO/ISCO 2263
IS WORK OVER?
Railway engineer
22%
#389 / 733
View rankingRailway engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Track, geometry and the study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Points, the blade and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
OLE, the height and the gauge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the possession and not leaving the wire wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not derail, and not signing half-done points.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- track geometry
- points
- OLE
- gauge
- possessions
- blades
- railway studies
- not jump to a yes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142