Automation index
How much of a Equality officer’s job can AI already do?
A stock equality plan comes earlier. Stopping what happens in the corridor do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Equality officer
29%
AI can already do 29% of this job.
#72 / 623
View rankingEquality officer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Diagnosis, equality plan and the pay register.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Harassment protocols, training and clauses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
The complaint, the committee and what nobody wants to hear.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Indicators, annual report and bargaining with the firm.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The agreement, tenders and social clauses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
That it is done, and not left as a PDF.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- equality plans
- pay gap register
- harassment protocols
- equality training
- gap diagnosis
- social clauses
- equality indicators
- bargain with the firm
Sources for this job· O*NET 13-1041.00· ESCO/ISCO 2422
IS WORK OVER?
Construction laborer
29%
#67 / 623
View rankingConstruction laborer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Tend pumps, compressors, or generators to provide power for tools, machinery, or equipment or to heat or move materials, such as asphalt.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 28% | +3.4 |
Dig ditches or trenches, backfill excavations, or compact and level earth to grade specifications, using picks, shovels, pneumatic tampers, or rakes.EstimateNo public source provides a precise figure. This is our estimate. | 10% | 28% | +2.8 |
Grind, scrape, sand, or polish surfaces, such as concrete, marble, terrazzo, or wood flooring, using abrasive tools or machines.EstimateNo public source provides a precise figure. This is our estimate. | 10% | 28% | +2.8 |
Signal equipment operators to facilitate alignment, movement, or adjustment of machinery, equipment, or materials.EstimateNo public source provides a precise figure. This is our estimate. | 10% | 28% | +2.8 |
Install sewer, water, or storm drain pipes, using pipe-laying machinery or laser guidance equipment.EstimateNo public source provides a precise figure. This is our estimate. | 9% | 28% | +2.5 |
Lubricate, clean, or repair machinery, equipment, or tools.EstimateNo public source provides a precise figure. This is our estimate. | 8% | 12% | +1 |
Measure, mark, or record openings or distances to layout areas where construction work will be performed.EstimateNo public source provides a precise figure. This is our estimate. | 8% | 55% | +4.4 |
Read plans, instructions, or specifications to determine work activities.EstimateNo public source provides a precise figure. This is our estimate. | 7% | 28% | +2 |
Other less frequent tasks (weight estimated from frequency).EstimateNo public source provides a precise figure. This is our estimate. | 26% | 28% | +7.3 |
| Total | 100% | 29% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- install wood elements in structures
- apply finish to concrete
- inspect masonry work
- check compatibility of materials
- dig soil mechanically
- pour concrete
- transport construction supplies
- operate digging construction equipment
- work in a construction team
- inspect construction supplies
Sources for this job· O*NET 47-2061.00· ESCO/ISCO 9313