IS WORK OVER?

Automation index

How much of a EV charger installer’s job can AI already do?

A single-line diagram comes earlier. A legal charger that actually charges at night do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

EV charger installer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Single-line, power and the certificate.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Conduit, cable and the board that will not take it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Configure, app and load balancing.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Residents, the bay and the neighbour who objects.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The electrical inspection and the inspector.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it charges at night, and not tripping the main.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • EV chargers
  • single-line
  • load balancing
  • electrical certificate
  • wire the bay
  • charger app
  • charge board
  • residents

Sources for this job· O*NET 47-2111.00· ESCO/ISCO 7411

Early childhood technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Routine, the yard and the kit.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Nappy, the change and dignity.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Nap, the one who will not sleep and the one who cries.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Food, the allergy and not mixing the plate.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Family, pick-up and not handing over to the wrong person.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
The nappy, and them staying calm.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • 0-3 routines
  • nappy change
  • nap
  • food allergies
  • pick-up
  • nursery yard
  • dignity
  • not hand to the wrong person

Sources for this job· O*NET 25-2011.00· ESCO/ISCO 5311

Analyse my job

Jobs with similar scores

  1. 360Mining engineer22%
  2. 361Forestry engineer22%
  3. 362Welding inspector22%
  4. 364Social integrator22%
  5. 365Heritage interpreter22%
  6. 366Banquet manager22%