IS WORK OVER?

Automation index

How much of a EV charger installer’s job can AI already do?

A single-line diagram comes earlier. A legal charger that actually charges at night do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

EV charger installer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Single-line, power and the certificate.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Conduit, cable and the board that will not take it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Configure, app and load balancing.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Residents, the bay and the neighbour who objects.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The electrical inspection and the inspector.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it charges at night, and not tripping the main.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • EV chargers
  • single-line
  • load balancing
  • electrical certificate
  • wire the bay
  • charger app
  • charge board
  • residents

Sources for this job· O*NET 47-2111.00· ESCO/ISCO 7411

HVAC engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Loads, flows and the plant.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Works, the duct and the one they crushed.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Commissioning, the balance and the room that sweats.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Noise, the grille and not leaving the whistle.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the saving and not killing the fresh air.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it does not sweat, and not oversizing.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • load calcs
  • air flows
  • ducts
  • balancing
  • grilles
  • fresh air
  • whistles
  • HVAC plant

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 404Forestry engineer22%
  2. 405Geotechnical engineer22%
  3. 406Welding inspector22%
  4. 408Social integrator22%
  5. 409Heritage interpreter22%
  6. 410Court interpreter22%