IS WORK OVER?

Automation index

How much of a EV charger installer’s job can AI already do?

A single-line diagram comes earlier. A legal charger that actually charges at night do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

EV charger installer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Single-line, power and the certificate.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Conduit, cable and the board that will not take it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Configure, app and load balancing.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Residents, the bay and the neighbour who objects.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The electrical inspection and the inspector.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it charges at night, and not tripping the main.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • EV chargers
  • single-line
  • load balancing
  • electrical certificate
  • wire the bay
  • charger app
  • charge board
  • residents

Sources for this job· O*NET 47-2111.00· ESCO/ISCO 7411

Pesticide applicator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Log, product and the dose.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Apply, drift and the wind that gets up.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
The withholding period and the one who wants in now.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
PPE, the container and the collection point.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The neighbour, the bees and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Not taking the river, and signing the treatment.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • farm log
  • pesticide dose
  • drift
  • withholding period
  • PPE
  • empty containers
  • bees
  • field wind

Sources for this job· O*NET 37-3012.00· ESCO/ISCO 6113

Analyse my job

Jobs with similar scores

  1. 340Agronomist22%
  2. 341Mining engineer22%
  3. 342Forestry engineer22%
  4. 344Social integrator22%
  5. 345Banquet manager22%
  6. 346Table official22%