IS WORK OVER?

Automation index

How much of a EV charger installer’s job can AI already do?

A single-line diagram comes earlier. A legal charger that actually charges at night do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

EV charger installer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Single-line, power and the certificate.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Conduit, cable and the board that will not take it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Configure, app and load balancing.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Residents, the bay and the neighbour who objects.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The electrical inspection and the inspector.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it charges at night, and not tripping the main.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • EV chargers
  • single-line
  • load balancing
  • electrical certificate
  • wire the bay
  • charger app
  • charge board
  • residents

Sources for this job· O*NET 47-2111.00· ESCO/ISCO 7411

Prison social worker

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Report, the board and the wing.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
The inmate, the family and the one who has nobody.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Leave, the risk and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Outside, the flat and them not falling the first month.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The lawyer, the rush and not dressing it.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the one who can leaves, and not selling cheap freedom.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • board reports
  • prison leave
  • wings
  • release flats
  • inmates' families
  • risk
  • first month outside
  • not dress it

Sources for this job· O*NET 21-1023.00· ESCO/ISCO 2635

Analyse my job

Jobs with similar scores

  1. 381Mining engineer22%
  2. 382Forestry engineer22%
  3. 383Welding inspector22%
  4. 385Social integrator22%
  5. 386Heritage interpreter22%
  6. 387Court interpreter22%