IS WORK OVER?

Automation index

How much of a EV charger installer’s job can AI already do?

A single-line diagram comes earlier. A legal charger that actually charges at night do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

EV charger installer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Single-line, power and the certificate.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Conduit, cable and the board that will not take it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Configure, app and load balancing.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Residents, the bay and the neighbour who objects.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The electrical inspection and the inspector.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it charges at night, and not tripping the main.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • EV chargers
  • single-line
  • load balancing
  • electrical certificate
  • wire the bay
  • charger app
  • charge board
  • residents

Sources for this job· O*NET 47-2111.00· ESCO/ISCO 7411

Secondary teacher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Unit, criteria and the exam.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Classroom, the group and the one who blows it up.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Cover, the corridor and the fight.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Family, the report and not giving a 5 for quiet.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Staff, inspection and not dressing it.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That they work, and nobody left out.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • unit plans
  • assessment criteria
  • secondary cover
  • corridors
  • the report
  • staff meeting
  • schools inspection
  • behaviour

Sources for this job· O*NET 25-2031.00· ESCO/ISCO 2330

Analyse my job

Jobs with similar scores

  1. 355Mining engineer22%
  2. 356Forestry engineer22%
  3. 357Welding inspector22%
  4. 359Social integrator22%
  5. 360Banquet manager22%
  6. 361Table official22%