IS WORK OVER?

Automation index

How much of a EV charger installer’s job can AI already do?

A single-line diagram comes earlier. A legal charger that actually charges at night do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

EV charger installer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Single-line, power and the certificate.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Conduit, cable and the board that will not take it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Configure, app and load balancing.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Residents, the bay and the neighbour who objects.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The electrical inspection and the inspector.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it charges at night, and not tripping the main.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • EV chargers
  • single-line
  • load balancing
  • electrical certificate
  • wire the bay
  • charger app
  • charge board
  • residents

Sources for this job· O*NET 47-2111.00· ESCO/ISCO 7411

Site engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Setting-out, axes and the level.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Rebar, cover and the one that is missing.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Concrete, the slump and not pouring if it fails.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Note, the diary and not dressing the delay.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The site manager, the rush and not covering bad steel.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That the column is there, and not covering the steel.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • setting-out
  • axes
  • rebar
  • cover
  • slump
  • site diary
  • levels
  • not cover steel

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 397Forestry engineer22%
  2. 398Geotechnical engineer22%
  3. 399Welding inspector22%
  4. 401Social integrator22%
  5. 402Heritage interpreter22%
  6. 403Court interpreter22%