IS WORK OVER?

Automation index

How much of a EV charger installer’s job can AI already do?

A single-line diagram comes earlier. A legal charger that actually charges at night do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

EV charger installer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Single-line, power and the certificate.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Conduit, cable and the board that will not take it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Configure, app and load balancing.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Residents, the bay and the neighbour who objects.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The electrical inspection and the inspector.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it charges at night, and not tripping the main.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • EV chargers
  • single-line
  • load balancing
  • electrical certificate
  • wire the bay
  • charger app
  • charge board
  • residents

Sources for this job· O*NET 47-2111.00· ESCO/ISCO 7411

Tower crane operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Radius, winds and the day’s log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Hoist, trolley and the slinger’s call.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Erect, climb and the base that is checked.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Two-crane lifts and crossing jibs.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The wind that gets up and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Sweep nobody, and not pushing the radius.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • tower-crane lifts
  • load charts
  • climb the crane
  • slinger’s call
  • jib wind
  • crossing jibs
  • crane base
  • trolley

Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343

Analyse my job

Jobs with similar scores

  1. 340Agronomist22%
  2. 341Mining engineer22%
  3. 342Forestry engineer22%
  4. 344Social integrator22%
  5. 345Banquet manager22%
  6. 346Table official22%