Automation index
How much of a Exam invigilator’s job can AI already do?
A hall protocol comes earlier. Them not copying without humiliating the one who shakes do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Exam invigilator
22%
AI can already do 22% of this job.
#478 / 733
View rankingExam invigilator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Hall, the protocol and the clock.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Identity, the ID and the one who is not.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Copying, the phone and removing it without a circus.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Incident, the minute and not making it up.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The one who shakes, extra time and not humiliating.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That they do not copy, and not humiliating.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- exam protocols
- ID
- phones
- incident minutes
- extra time
- exam hall
- remove without a circus
- not humiliate
Sources for this job· O*NET 25-1191.00· ESCO/ISCO 2359
IS WORK OVER?
Bridge engineer
22%
#386 / 733
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142