IS WORK OVER?

Automation index

How much of a Excavator operator’s job can AI already do?

A GPS set-out comes earlier. Not breaking the pipe that is not on the drawing do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Excavator operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, levels and the machine log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Dig, load and the batter that comes in.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Services, the blind pipe and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Maintenance, grease and the pin that snaps.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The labourer, the lorry and covering nobody.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Not breaking what is buried, and leaving a clean formation.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • dig with excavator
  • load lorries
  • batters
  • buried services
  • set-out levels
  • grease the machine
  • formation
  • site GPS

Sources for this job· O*NET 47-2073.00· ESCO/ISCO 8342

CAD designer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, dimensions and the drawing.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Clash, the hit and not leaving it.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
List, the material and the one that does not exist.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Change, the revision and not losing the native.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The shop, the doubt and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it can be made, and not leaving the clash.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • 3D models
  • dimensions
  • clashes
  • bills of materials
  • revisions
  • shop drawings
  • natives
  • hits

Sources for this job· O*NET 17-3013.00· ESCO/ISCO 3118

Analyse my job

Jobs with similar scores

  1. 691Stonemason18%
  2. 692Port crane operator18%
  3. 693Tower crane operator18%
  4. 695Shepherd18%
  5. 696Vehicle painter18%
  6. 697Podiatrist18%