Automation index
How much of a Excavator operator’s job can AI already do?
A GPS set-out comes earlier. Not breaking the pipe that is not on the drawing do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Excavator operator
18%
AI can already do 18% of this job.
#704 / 763
View rankingExcavator operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set-out, levels and the machine log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Dig, load and the batter that comes in.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Services, the blind pipe and stopping in time.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Maintenance, grease and the pin that snaps.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The labourer, the lorry and covering nobody.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Not breaking what is buried, and leaving a clean formation.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- dig with excavator
- load lorries
- batters
- buried services
- set-out levels
- grease the machine
- formation
- site GPS
Sources for this job· O*NET 47-2073.00· ESCO/ISCO 8342
IS WORK OVER?
Geomatics engineer
22%
#412 / 763
View rankingGeomatics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Station, the base and the cloud.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the axis and the one that moved.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Model, the drift and not hiding metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the setting-out and going down to see it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not signing the drift.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the axis is there, and not signing metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- point clouds
- total stations
- axes
- setting-out
- drift
- bases
- geomatics
- the field
Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165