Automation index
How much of a Excavator operator’s job can AI already do?
A GPS set-out comes earlier. Not breaking the pipe that is not on the drawing do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Excavator operator
18%
AI can already do 18% of this job.
#574 / 633
View rankingExcavator operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set-out, levels and the machine log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Dig, load and the batter that comes in.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Services, the blind pipe and stopping in time.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Maintenance, grease and the pin that snaps.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The labourer, the lorry and covering nobody.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Not breaking what is buried, and leaving a clean formation.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- dig with excavator
- load lorries
- batters
- buried services
- set-out levels
- grease the machine
- formation
- site GPS
Sources for this job· O*NET 47-2073.00· ESCO/ISCO 8342
IS WORK OVER?
Health and safety officer
29%
#73 / 633
View rankingHealth and safety officer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Risk assessments, PPE and procedures.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Safety plans, coordination and minutes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Site or plant visit, stop unsafe work.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Train, investigate accidents and propose measures.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Labour inspectorate, mutual and activity coordination.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Judgement, sign-off and preventive liability.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- assess workplace risk
- write safety plans
- stop unsafe work
- investigate accidents
- deliver H&S training
- coordinate contractors
- choose PPE
- safety minutes
Sources for this job· O*NET 19-5011.00· ESCO/ISCO 2263