Automation index
How much of a Excavator operator’s job can AI already do?
A GPS set-out comes earlier. Not breaking the pipe that is not on the drawing do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Excavator operator
18%
AI can already do 18% of this job.
#584 / 643
View rankingExcavator operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set-out, levels and the machine log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Dig, load and the batter that comes in.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Services, the blind pipe and stopping in time.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Maintenance, grease and the pin that snaps.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The labourer, the lorry and covering nobody.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Not breaking what is buried, and leaving a clean formation.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- dig with excavator
- load lorries
- batters
- buried services
- set-out levels
- grease the machine
- formation
- site GPS
Sources for this job· O*NET 47-2073.00· ESCO/ISCO 8342
IS WORK OVER?
Sonographer
20%
#479 / 643
View rankingSonographer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Protocols, IDs and worklists.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Scan, measure and capture slices.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 12% | +2.6 |
Calm, explain and not jump a diagnosis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Brief the radiologist and archive the study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Probes, gel and kit maintenance.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Pregnancy, bad news and shoulder ergonomics.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Protocols, IDs and worklists
- Scan, measure and capture slices
- Calm, explain and not jump a diagnosis
- Probes, gel and kit maintenance
- tecnico en ecografia
- ecografista
- sonographer
Sources for this job· O*NET 29-2032.00· ESCO/ISCO 3211