IS WORK OVER?

Automation index

How much of a Façade technician’s job can AI already do?

A panel list comes earlier. Hanging the façade without letting water in do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Façade technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, anchors and the panel list.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Hang, adjust and the panel that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Joints, water and the weathertightness test.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Scaffold, cradle and façade wind.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The architect, the sample and the shade that misses.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
No water in, and not forcing the anchor.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • hang façades
  • anchors
  • panel lists
  • weathertightness
  • cradle
  • façade joints
  • colour samples
  • anchor set-out

Sources for this job· O*NET 47-2081.00· ESCO/ISCO 7123

Drainlayer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Drawings, cameras and connection logs.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Open, pipe and set the fall.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Pits, gases and confined spaces.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Street, neighbours and reinstating pavement.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Quantities, extras and the council.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a connection that bursts.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Drawings, cameras and connection logs
  • Open, pipe and set the fall
  • Pits, gases and confined spaces
  • Quantities, extras and the council
  • Not leaving a connection that bursts
  • pocero
  • alcantarillado
  • drainlayer

Sources for this job· O*NET 47-2151.00· ESCO/ISCO 7126

Analyse my job

Jobs with similar scores

  1. 415Prison educator21%
  2. 416Dialysis nurse21%
  3. 417Driving examiner21%
  4. 419Physiotherapist21%
  5. 420Livestock farmer21%
  6. 421Gynaecologist21%