IS WORK OVER?

Automation index

How much of a Façade technician’s job can AI already do?

A panel list comes earlier. Hanging the façade without letting water in do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Façade technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, anchors and the panel list.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Hang, adjust and the panel that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Joints, water and the weathertightness test.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Scaffold, cradle and façade wind.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The architect, the sample and the shade that misses.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
No water in, and not forcing the anchor.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • hang façades
  • anchors
  • panel lists
  • weathertightness
  • cradle
  • façade joints
  • colour samples
  • anchor set-out

Sources for this job· O*NET 47-2081.00· ESCO/ISCO 7123

Mixer-truck driver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Order, mix and mixing time.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Drive, site and the tight access.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Pour, pump and the one who wants more water.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Wash, leftovers and not leaving a hard drum.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The jam, the delay and the concrete that sets.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Arrive fresh, and not adding extra water.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drive mixers
  • batch
  • pour concrete
  • wash the drum
  • slump
  • concrete pump
  • mix order
  • site access

Sources for this job· O*NET 53-3032.00· ESCO/ISCO 8332

Analyse my job

Jobs with similar scores

  1. 424Prison educator21%
  2. 425Dialysis nurse21%
  3. 426Driving examiner21%
  4. 428Physiotherapist21%
  5. 429Livestock farmer21%
  6. 430Gynaecologist21%