IS WORK OVER?

Automation index

How much of a Facilities engineer’s job can AI already do?

A CMMS comes earlier. The cooling not dying in August without leaving the generator without diesel do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Facilities engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
CMMS, tickets and the PPM.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Roof, the chiller and the one that will not start.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Generator, the diesel and not leaving it dry.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Fire, the pump and the monthly test.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The tenant, August and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That cooling does not die, and not leaving the generator dry.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • CMMS
  • PPM
  • chillers
  • generators
  • diesel
  • fire pumps
  • roofs
  • tickets

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Gas network engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, pressures and the diameter.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Trench, the weld and the one that was not x-rayed.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Leak, the detector and getting people out.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Cut, the bypass and not leaving them without gas.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The council, the rush and not covering without testing.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the trench does not go up, and not leaving them without gas.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • network pressures
  • diameters
  • trenches
  • gas welds
  • leaks
  • detectors
  • bypass
  • x-rays

Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2145

Analyse my job

Jobs with similar scores

  1. 389Control engineer22%
  2. 390Corrosion engineer22%
  3. 391Instrumentation engineer22%
  4. 393Mechatronics engineer22%
  5. 394Mining engineer22%
  6. 395Bridge engineer22%