IS WORK OVER?

Automation index

How much of a Facilities engineer’s job can AI already do?

A CMMS comes earlier. The cooling not dying in August without leaving the generator without diesel do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Facilities engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
CMMS, tickets and the PPM.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Roof, the chiller and the one that will not start.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Generator, the diesel and not leaving it dry.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Fire, the pump and the monthly test.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The tenant, August and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That cooling does not die, and not leaving the generator dry.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • CMMS
  • PPM
  • chillers
  • generators
  • diesel
  • fire pumps
  • roofs
  • tickets

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Geomatics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Station, the base and the cloud.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the axis and the one that moved.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Model, the drift and not hiding metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the setting-out and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not signing the drift.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the axis is there, and not signing metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • point clouds
  • total stations
  • axes
  • setting-out
  • drift
  • bases
  • geomatics
  • the field

Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165

Analyse my job

Jobs with similar scores

  1. 389Control engineer22%
  2. 390Corrosion engineer22%
  3. 391Instrumentation engineer22%
  4. 393Mechatronics engineer22%
  5. 394Mining engineer22%
  6. 395Bridge engineer22%