IS WORK OVER?

Automation index

How much of a Facilities engineer’s job can AI already do?

A CMMS comes earlier. The cooling not dying in August without leaving the generator without diesel do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Facilities engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
CMMS, tickets and the PPM.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Roof, the chiller and the one that will not start.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Generator, the diesel and not leaving it dry.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Fire, the pump and the monthly test.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The tenant, August and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That cooling does not die, and not leaving the generator dry.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • CMMS
  • PPM
  • chillers
  • generators
  • diesel
  • fire pumps
  • roofs
  • tickets

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

QA automation engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Test, the selector and the flake.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Pipeline, the green and the one that lies.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Bug, the repro and not closing it blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Data, the environment and not sharing prod.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The developer, the rush and not skipping the one that fails.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Catch the bug, and not painting a lying green.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • automated tests
  • selectors
  • flakes
  • QA pipelines
  • repro
  • environments
  • lying green
  • debug tests

Sources for this job· O*NET 15-1253.00· ESCO/ISCO 2519

Analyse my job

Jobs with similar scores

  1. 408Corrosion engineer22%
  2. 409Firmware engineer22%
  3. 410Instrumentation engineer22%
  4. 412Mechatronics engineer22%
  5. 413Mining engineer22%
  6. 414Bridge engineer22%