IS WORK OVER?

Automation index

How much of a Factory operator’s job can AI already do?

A log and an SOP come earlier. Line pace, a jam, and 2 a.m. do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Factory operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Logs, SOPs and quality records.
Estimate

No public source provides a precise figure. This is our estimate.

16%38%+6.1
Read orders and line screens.
Estimate

No public source provides a precise figure. This is our estimate.

14%32%+4.5
Feed, run and unjam the line.
Estimate

No public source provides a precise figure. This is our estimate.

22%18%+4
Changeover and tool cleaning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
In-station quality and stopping a defect.
Estimate

No public source provides a precise figure. This is our estimate.

16%20%+3.2
Shifts, safety and coworkers.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Logs, SOPs and quality records
  • Read orders and line screens
  • Feed, run and unjam the line
  • Changeover and tool cleaning
  • In-station quality and stopping a defect
  • Shifts, safety and coworkers
  • operario de fabrica
  • factory operator
  • linea de produccion

Sources for this job· O*NET 51-2099.00· ESCO/ISCO 8211

Coast guard

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Shout, the position and the boat.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Sea, the one who is drowning and the storm.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Inspection, the trawler and the one that runs.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Night, the radar and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The station, the note and not dressing the shortfall.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Get the one who is drowning, and not losing the boat.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • boats
  • shouts
  • drowning
  • trawlers
  • radar
  • the storm
  • inspections at sea
  • station notes

Sources for this job· O*NET 33-3051.00· ESCO/ISCO 5411

Analyse my job

Jobs with similar scores

  1. 304Internist24%
  2. 305Neurologist24%
  3. 306CNC machinist24%
  4. 308Landscape architect24%
  5. 309University professor24%
  6. 310Judicial secretary24%