IS WORK OVER?

Automation index

How much of a Factory operator’s job can AI already do?

A log and an SOP come earlier. Line pace, a jam, and 2 a.m. do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Factory operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Logs, SOPs and quality records.
Estimate

No public source provides a precise figure. This is our estimate.

16%38%+6.1
Read orders and line screens.
Estimate

No public source provides a precise figure. This is our estimate.

14%32%+4.5
Feed, run and unjam the line.
Estimate

No public source provides a precise figure. This is our estimate.

22%18%+4
Changeover and tool cleaning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
In-station quality and stopping a defect.
Estimate

No public source provides a precise figure. This is our estimate.

16%20%+3.2
Shifts, safety and coworkers.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Logs, SOPs and quality records
  • Read orders and line screens
  • Feed, run and unjam the line
  • Changeover and tool cleaning
  • In-station quality and stopping a defect
  • Shifts, safety and coworkers
  • operario de fabrica
  • factory operator
  • linea de produccion

Sources for this job· O*NET 51-2099.00· ESCO/ISCO 8211

Hydrologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Hydrograph, catchment and the model.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, gauging and the one that does not read.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Flood, the alert and not delaying.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Low flow, irrigation and the clash.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The authority, the figure and not dressing the flow.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
If the river rises, call it.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • hydrographs
  • catchments
  • gauging
  • floods
  • low flow
  • hydrology alerts
  • flows
  • the river authority

Sources for this job· O*NET 19-2043.00· ESCO/ISCO 2114

Analyse my job

Jobs with similar scores

  1. 273Internist24%
  2. 274Neurologist24%
  3. 275CNC machinist24%
  4. 277Landscape architect24%
  5. 278University professor24%
  6. 279Judicial secretary24%