IS WORK OVER?

Automation index

How much of a Factory operator’s job can AI already do?

A log and an SOP come earlier. Line pace, a jam, and 2 a.m. do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Factory operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Logs, SOPs and quality records.
Estimate

No public source provides a precise figure. This is our estimate.

16%38%+6.1
Read orders and line screens.
Estimate

No public source provides a precise figure. This is our estimate.

14%32%+4.5
Feed, run and unjam the line.
Estimate

No public source provides a precise figure. This is our estimate.

22%18%+4
Changeover and tool cleaning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
In-station quality and stopping a defect.
Estimate

No public source provides a precise figure. This is our estimate.

16%20%+3.2
Shifts, safety and coworkers.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Logs, SOPs and quality records
  • Read orders and line screens
  • Feed, run and unjam the line
  • Changeover and tool cleaning
  • In-station quality and stopping a defect
  • Shifts, safety and coworkers
  • operario de fabrica
  • factory operator
  • linea de produccion

Sources for this job· O*NET 51-2099.00· ESCO/ISCO 8211

Waste technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Code, characterise and the paper.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Plant, the mix and the one you cannot.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Move, the haulier and the note.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Inspection, the tip and not hiding.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The producer, the saving and not diluting.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Where it should, not next door.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • waste codes
  • characterise waste
  • transfer notes
  • the tip
  • mixing
  • producers
  • waste papers
  • not dilute

Sources for this job· O*NET 19-4042.00· ESCO/ISCO 2143

Analyse my job

Jobs with similar scores

  1. 273Internist24%
  2. 274Neurologist24%
  3. 275CNC machinist24%
  4. 277Landscape architect24%
  5. 278University professor24%
  6. 279Judicial secretary24%