IS WORK OVER?

Automation index

How much of a Factory operator’s job can AI already do?

A log and an SOP come earlier. Line pace, a jam, and 2 a.m. do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Factory operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Logs, SOPs and quality records.
Estimate

No public source provides a precise figure. This is our estimate.

16%38%+6.1
Read orders and line screens.
Estimate

No public source provides a precise figure. This is our estimate.

14%32%+4.5
Feed, run and unjam the line.
Estimate

No public source provides a precise figure. This is our estimate.

22%18%+4
Changeover and tool cleaning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
In-station quality and stopping a defect.
Estimate

No public source provides a precise figure. This is our estimate.

16%20%+3.2
Shifts, safety and coworkers.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Logs, SOPs and quality records
  • Read orders and line screens
  • Feed, run and unjam the line
  • Changeover and tool cleaning
  • In-station quality and stopping a defect
  • Shifts, safety and coworkers
  • operario de fabrica
  • factory operator
  • linea de produccion

Sources for this job· O*NET 51-2099.00· ESCO/ISCO 8211

Wind-turbine technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
SCADA, the code and the spare.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Climb, the wind and the one who is sick.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Nacelle, the oil and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Rescue, the protocol and not improvising.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The storm, the access and aborting.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Come down whole, and the turbine running.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • farm SCADA
  • climb the tower
  • nacelle
  • height rescue
  • oils
  • fault codes
  • access
  • wind

Sources for this job· O*NET 49-9081.00· ESCO/ISCO 7412

Analyse my job

Jobs with similar scores

  1. 278Internist24%
  2. 279Neurologist24%
  3. 280CNC machinist24%
  4. 282Landscape architect24%
  5. 283University professor24%
  6. 284Judicial secretary24%