IS WORK OVER?

Automation index

How much of a Farrier’s job can AI already do?

A hoof card comes earlier. Shoeing the horse so it is not lame the next day do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Farrier

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Hoof, balance and the animal’s card.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Trim, nail and the one that will not stand.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Forge, the made shoe and the trim.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Lameness, the vet and not blaming the shoe.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The yard, the owner and the one who does not pay.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Not lame, and not over-nailing.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • shoe horses
  • balance
  • trim hooves
  • made shoes
  • lameness
  • the forge
  • yards
  • nail

Sources for this job· O*NET 45-2021.00· ESCO/ISCO 6121

Game designer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
GDD, flows and economy tables.
Estimate

No public source provides a precise figure. This is our estimate.

22%48%+10.6
Leveling, quests and tutorial copy.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Playtest, telemetry and reading frustration.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Align art, engineering and production.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Cut systems and defend the feel.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Decide what the game is, and is not.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • design interfaces
  • prototypes
  • figma
  • GDD, flows and economy tables
  • Leveling, quests and tutorial copy
  • Align art, engineering and production
  • Cut systems and defend the feel
  • Decide what the game is, and is not
  • game designer
  • diseñador de videojuegos

Sources for this job· O*NET 15-1255.00· ESCO/ISCO 2166

Analyse my job

Jobs with similar scores

  1. 506Stucco artist19%
  2. 507Kayak guide19%
  3. 508Mountain guide19%
  4. 510Blacksmith19%
  5. 511Shutter installer19%
  6. 512Window installer19%