IS WORK OVER?

Automation index

How much of a Farrier’s job can AI already do?

A hoof card comes earlier. Shoeing the horse so it is not lame the next day do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Farrier

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Hoof, balance and the animal’s card.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Trim, nail and the one that will not stand.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Forge, the made shoe and the trim.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Lameness, the vet and not blaming the shoe.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The yard, the owner and the one who does not pay.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Not lame, and not over-nailing.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • shoe horses
  • balance
  • trim hooves
  • made shoes
  • lameness
  • the forge
  • yards
  • nail

Sources for this job· O*NET 45-2021.00· ESCO/ISCO 6121

Railway engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Track, geometry and the study.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Points, the blade and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
OLE, the height and the gauge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the possession and not leaving the wire wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not derail, and not signing half-done points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • track geometry
  • points
  • OLE
  • gauge
  • possessions
  • blades
  • railway studies
  • not jump to a yes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 593Border guard19%
  2. 594Kayak guide19%
  3. 595Mountain guide19%
  4. 597Blacksmith19%
  5. 598Site engineer19%
  6. 599Shutter installer19%