IS WORK OVER?

Automation index

How much of a Farrier’s job can AI already do?

A hoof card comes earlier. Shoeing the horse so it is not lame the next day do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Farrier

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Hoof, balance and the animal’s card.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Trim, nail and the one that will not stand.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Forge, the made shoe and the trim.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Lameness, the vet and not blaming the shoe.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The yard, the owner and the one who does not pay.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Not lame, and not over-nailing.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • shoe horses
  • balance
  • trim hooves
  • made shoes
  • lameness
  • the forge
  • yards
  • nail

Sources for this job· O*NET 45-2021.00· ESCO/ISCO 6121

Telecom engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Size, simulate and plan radio and fibre.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Projects, permits and sites.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Field, measurements and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Incidents, NOC and operators.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Rules, spectrum and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a town dark from a mistake.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Size, simulate and plan radio and fibre
  • Projects, permits and sites
  • Field, measurements and commissioning
  • Incidents, NOC and operators
  • Rules, spectrum and documentation
  • Not leaving a town dark from a mistake
  • ingeniero de telecomunicaciones
  • telecom engineer

Sources for this job· O*NET 17-2072.00· ESCO/ISCO 2153

Analyse my job

Jobs with similar scores

  1. 496Stucco artist19%
  2. 497Kayak guide19%
  3. 498Mountain guide19%
  4. 500Blacksmith19%
  5. 501Shutter installer19%
  6. 502Window installer19%