Automation index
How much of a Façade technician’s job can AI already do?
A panel list comes earlier. Hanging the façade without letting water in do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Façade technician
21%
AI can already do 21% of this job.
#427 / 643
View rankingFaçade technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set-out, anchors and the panel list.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Hang, adjust and the panel that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Joints, water and the weathertightness test.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Scaffold, cradle and façade wind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The architect, the sample and the shade that misses.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
No water in, and not forcing the anchor.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- hang façades
- anchors
- panel lists
- weathertightness
- cradle
- façade joints
- colour samples
- anchor set-out
Sources for this job· O*NET 47-2081.00· ESCO/ISCO 7123
IS WORK OVER?
Bus driver
15%
#630 / 643
View rankingBus driver
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Run sheet, logs and clocking.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Drive the route or the charter.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Stops, accessibility and fare or validation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 10% | +1.8 |
Incidents, diversions and passenger care.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Pre-trip check and defect reports.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Shifts, fatigue and driving rules.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
| Total | 100% | 15% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- drive
- route
- load goods
- Run sheet, logs and clocking
- Drive the route or the charter
- Incidents, diversions and passenger care
- Pre-trip check and defect reports
- Shifts, fatigue and driving rules
- conductor de autobus
- bus driver
Sources for this job· O*NET 53-3052.00· ESCO/ISCO 8331