How much of a Façade technician’s job can AI already do?

A panel list comes earlier. Hanging the façade without letting water in do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Façade technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, anchors and the panel list.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Hang, adjust and the panel that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Joints, water and the weathertightness test.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Scaffold, cradle and façade wind.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The architect, the sample and the shade that misses.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
No water in, and not forcing the anchor.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • hang façades
  • anchors
  • panel lists
  • weathertightness
  • cradle
  • façade joints
  • colour samples
  • anchor set-out

Sources for this job· O*NET 47-2081.00· ESCO/ISCO 7123

Crane operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Lift plan, radii and weights.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Run the crane and place the load.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Signals, wind and exclusion zone.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, foreman and maintenance.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, inspections and machine tests.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a load over someone.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Lift plan, radii and weights
  • Run the crane and place the load
  • Signals, wind and exclusion zone
  • Site, foreman and maintenance
  • Logs, inspections and machine tests
  • Not leaving a load over someone
  • gruista
  • operador de grua
  • crane operator

Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343

Analyse my job

Jobs with similar scores

  1. 415Prison educator21%
  2. 416Dialysis nurse21%
  3. 417Driving examiner21%
  4. 419Physiotherapist21%
  5. 420Livestock farmer21%
  6. 421Gynaecologist21%