IS WORK OVER?

Automation index

How much of a Façade technician’s job can AI already do?

A panel list comes earlier. Hanging the façade without letting water in do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Façade technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, anchors and the panel list.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Hang, adjust and the panel that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Joints, water and the weathertightness test.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Scaffold, cradle and façade wind.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The architect, the sample and the shade that misses.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
No water in, and not forcing the anchor.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • hang façades
  • anchors
  • panel lists
  • weathertightness
  • cradle
  • façade joints
  • colour samples
  • anchor set-out

Sources for this job· O*NET 47-2081.00· ESCO/ISCO 7123

Geomatics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Station, the base and the cloud.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the axis and the one that moved.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Model, the drift and not hiding metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the setting-out and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not signing the drift.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the axis is there, and not signing metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • point clouds
  • total stations
  • axes
  • setting-out
  • drift
  • bases
  • geomatics
  • the field

Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165

Analyse my job

Jobs with similar scores

  1. 510Prison educator21%
  2. 511Dialysis nurse21%
  3. 512Driving examiner21%
  4. 514Physiotherapist21%
  5. 515Livestock farmer21%
  6. 516Gynaecologist21%