IS WORK OVER?

Automation index

How much of a Façade technician’s job can AI already do?

A panel list comes earlier. Hanging the façade without letting water in do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Façade technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, anchors and the panel list.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Hang, adjust and the panel that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Joints, water and the weathertightness test.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Scaffold, cradle and façade wind.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The architect, the sample and the shade that misses.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
No water in, and not forcing the anchor.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • hang façades
  • anchors
  • panel lists
  • weathertightness
  • cradle
  • façade joints
  • colour samples
  • anchor set-out

Sources for this job· O*NET 47-2081.00· ESCO/ISCO 7123

Mason

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read drawings, measure and order material.
Estimate

No public source provides a precise figure. This is our estimate.

16%30%+4.8
Setting out and levels on site.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Raise walls, render and plaster.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Floors, tiling and finishing.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Safety, scaffolding and clearing the bay.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Coordinate with foreman, plumber and electrician.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%15%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • build walls
  • plaster
  • site work
  • Read drawings, measure and order material
  • Setting out and levels on site
  • Raise walls, render and plaster
  • Floors, tiling and finishing
  • Safety, scaffolding and clearing the bay
  • albanil
  • mason

Sources for this job· O*NET 47-2021.00· ESCO/ISCO 7112

Analyse my job

Jobs with similar scores

  1. 424Prison educator21%
  2. 425Dialysis nurse21%
  3. 426Driving examiner21%
  4. 428Physiotherapist21%
  5. 429Livestock farmer21%
  6. 430Gynaecologist21%