Automation index
How much of a Façade technician’s job can AI already do?
A panel list comes earlier. Hanging the façade without letting water in do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Façade technician
21%
AI can already do 21% of this job.
#418 / 633
View rankingFaçade technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set-out, anchors and the panel list.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Hang, adjust and the panel that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Joints, water and the weathertightness test.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Scaffold, cradle and façade wind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The architect, the sample and the shade that misses.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
No water in, and not forcing the anchor.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- hang façades
- anchors
- panel lists
- weathertightness
- cradle
- façade joints
- colour samples
- anchor set-out
Sources for this job· O*NET 47-2081.00· ESCO/ISCO 7123
IS WORK OVER?
Port crane operator
18%
#572 / 633
View rankingPort crane operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Stowage, bays and the twistlock.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Hoist, the wind and the spreader.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Shift, the ship that arrives and the one that leaves.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Breakdown, the spreader that will not lock and stopping.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The docker below and covering nobody.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Not hitting the ship, and leaving the bay clear.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- stowage
- twistlocks
- spreader
- bays
- lift boxes
- quay wind
- terminal shifts
- cover nobody
Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343