Automation index
How much of a Fibre technician’s job can AI already do?
An OTDR comes earlier. Splicing in the chamber so the customer can browse do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Fibre technician
22%
AI can already do 22% of this job.
#460 / 733
View rankingFibre technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Route, OTDR and the splice log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Chamber, splice and the fibre that breaks.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
CTO, drop and the customer who sees no light.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Pole, façade and the missing permit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Rain, the cover and not leaving the chamber open.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That they can browse, and not leaving a dirty splice.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- splice fibre
- OTDR
- chambers
- CTO
- drops
- fibre strands
- poles
- splice logs
Sources for this job· O*NET 49-2022.00· ESCO/ISCO 7422
IS WORK OVER?
Bridge engineer
22%
#386 / 733
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142