Automation index
How much of a Fibre technician’s job can AI already do?
An OTDR comes earlier. Splicing in the chamber so the customer can browse do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Fibre technician
22%
AI can already do 22% of this job.
#388 / 633
View rankingFibre technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Route, OTDR and the splice log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Chamber, splice and the fibre that breaks.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
CTO, drop and the customer who sees no light.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Pole, façade and the missing permit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Rain, the cover and not leaving the chamber open.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That they can browse, and not leaving a dirty splice.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- splice fibre
- OTDR
- chambers
- CTO
- drops
- fibre strands
- poles
- splice logs
Sources for this job· O*NET 49-2022.00· ESCO/ISCO 7422
IS WORK OVER?
Nuclear engineer
24%
#267 / 633
View rankingNuclear engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Neutronics, thermal-hydraulics and the file.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Control room, tests and the set-point.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Licence, the regulator and the safety analyses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Outage, reload and spent fuel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
The event, safety culture and the report.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Not playing with reactivity, and signing the analysis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- neutronics
- thermal-hydraulics
- nuclear licence
- reload
- safety analysis
- control room
- spent fuel
- safety culture
Sources for this job· O*NET 17-2161.00· ESCO/ISCO 2149