Automation index
How much of a Fibre technician’s job can AI already do?
An OTDR comes earlier. Splicing in the chamber so the customer can browse do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Fibre technician
22%
AI can already do 22% of this job.
#388 / 633
View rankingFibre technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Route, OTDR and the splice log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Chamber, splice and the fibre that breaks.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
CTO, drop and the customer who sees no light.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Pole, façade and the missing permit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Rain, the cover and not leaving the chamber open.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That they can browse, and not leaving a dirty splice.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- splice fibre
- OTDR
- chambers
- CTO
- drops
- fibre strands
- poles
- splice logs
Sources for this job· O*NET 49-2022.00· ESCO/ISCO 7422
IS WORK OVER?
Tower crane operator
18%
#573 / 633
View rankingTower crane operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Radius, winds and the day’s log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Hoist, trolley and the slinger’s call.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Erect, climb and the base that is checked.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Two-crane lifts and crossing jibs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The wind that gets up and stopping in time.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Sweep nobody, and not pushing the radius.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tower-crane lifts
- load charts
- climb the crane
- slinger’s call
- jib wind
- crossing jibs
- crane base
- trolley
Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343