Automation index
How much of a Film director’s job can AI already do?
A storyboard and a shooting plan assemble. Saying action, watching the actor, and cutting or not do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Film director
19%
AI can already do 19% of this job.
#582 / 743
View rankingFilm director
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Breakdown, storyboard and shooting plan.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Casting, locations and pre-rehearsal.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Direct on set: action, continuity and taste.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Edit, colour and sound with the team.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Handle producer, time and budget.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
Vision of the film and final cut.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Breakdown, storyboard and shooting plan
- Casting, locations and pre-rehearsal
- Edit, colour and sound with the team
- Handle producer, time and budget
- Vision of the film and final cut
- director de cine
- film director
- realizador
Sources for this job· O*NET 27-2012.00· ESCO/ISCO 2654
IS WORK OVER?
Bridge engineer
22%
#391 / 743
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142