Automation index
How much of a Film director’s job can AI already do?
A storyboard and a shooting plan assemble. Saying action, watching the actor, and cutting or not do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Film director
19%
AI can already do 19% of this job.
#500 / 643
View rankingFilm director
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Breakdown, storyboard and shooting plan.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Casting, locations and pre-rehearsal.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Direct on set: action, continuity and taste.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Edit, colour and sound with the team.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Handle producer, time and budget.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
Vision of the film and final cut.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Breakdown, storyboard and shooting plan
- Casting, locations and pre-rehearsal
- Edit, colour and sound with the team
- Handle producer, time and budget
- Vision of the film and final cut
- director de cine
- film director
- realizador
Sources for this job· O*NET 27-2012.00· ESCO/ISCO 2654
IS WORK OVER?
Lathe operator
26%
#219 / 643
View rankingLathe operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read the drawing, tolerances and the route card.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Set up, clamp, pick the tool and the origin.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Turn, face, thread and finish the part.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 28% | +5 |
Measure, tweak offsets and not scrap the batch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Lathe care, swarf and safety.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Grades, times and liability for the dimension.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- turn parts
- set up the lathe
- measure dimensions
- cut threads
- adjust offsets
- read mechanical drawings
- avoid scrap
- pick tools
Sources for this job· O*NET 51-4034.00· ESCO/ISCO 7223