Automation index
How much of a Film director’s job can AI already do?
A storyboard and a shooting plan assemble. Saying action, watching the actor, and cutting or not do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Film director
19%
AI can already do 19% of this job.
#491 / 633
View rankingFilm director
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Breakdown, storyboard and shooting plan.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Casting, locations and pre-rehearsal.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Direct on set: action, continuity and taste.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Edit, colour and sound with the team.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Handle producer, time and budget.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
Vision of the film and final cut.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Breakdown, storyboard and shooting plan
- Casting, locations and pre-rehearsal
- Edit, colour and sound with the team
- Handle producer, time and budget
- Vision of the film and final cut
- director de cine
- film director
- realizador
Sources for this job· O*NET 27-2012.00· ESCO/ISCO 2654
IS WORK OVER?
Naval architect
25%
#240 / 633
View rankingNaval architect
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Stability, strength and hull forms.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Drawings, specs and class rules.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Yard, sea trials and owner.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Systems, machinery and onboard safety.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Rules, IMO and documentation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign a hull that will not break.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- building plans
- renders
- sign a project
- Stability, strength and hull forms
- Drawings, specs and class rules
- Yard, sea trials and owner
- Systems, machinery and onboard safety
- Rules, IMO and documentation
- Sign a hull that will not break
- ingeniero naval
Sources for this job· O*NET 17-2121.00· ESCO/ISCO 2144